How Long Does It Take to Build a Custom App?

Typical timelines for an MVP, a business app and a larger platform.

Short answer

A small MVP typically takes 6 to 10 weeks, a business application with a backend 3 to 6 months, and a larger platform 6 months or more. Discovery and design usually take 2 to 4 weeks before development starts.

  • Clear requirements shorten every later stage.
  • Integrations and approvals (such as app store review) add calendar time.
  • Working software is usually visible within the first few weeks.

What are the stages of building an app?

  1. Discovery (1–2 weeks): requirements, users, integrations, scope and estimate.
  2. Design (1–3 weeks): user flows and interface designs for the key screens.
  3. Build (4 weeks to several months): development in short iterations with demos.
  4. Launch (1–2 weeks): testing, release to the web or app stores, monitoring.

Typical timelines by project size

Project Typical timeline
MVP with one core feature 6–10 weeks
Business app with backend and admin 3–6 months
Platform with several apps and integrations 6+ months

What slows a project down?

Unclear or changing requirements, slow feedback on designs and demos, third-party integrations with poor documentation, and content or data that arrives late.

Planning a project like this?Send us the details and we'll scope it.
Get an estimate

Frequently asked questions

Can you speed up development by adding more developers?

Only up to a point. Small, focused teams are usually faster than large ones on projects of this size.

Have a software idea?

Tell us what you want to build and we'll send you a scoped estimate.